top of page

Tenderfoot Paving is Complete

Dan Burroughs
11 minutes ago
1 min read

The Tenderfoot Street paving project is complete.

Thanks for everybody's cooperation and patience during construction.

Will do it again in 12-15 years!


-Dan B


Tenderfoot Street Paving
Tenderfoot Street Paving

 
 

Recent Posts

See All
Tenderfoot Street paving half done

The contractor completed the north side (Highway side) of the asphalt paving today. And they completed the south side (Lake side) between highway 6 and the Anchorage East driveway. Tomorrow on Thursda

 
 
Dan Burroughs, P.E.
Town Engineer

Town of Dillon, Colorado

970.418.2544

danb@townofdillon.com

© 2021 by Town of DIllon, Colorado . Proudly created with Wix.com

bottom of page