top of page

Columbine Hills is finishing the loading dock paving today.

Dan Burroughs
Jun 10, 2023
1 min read

The contractor, Columbine Hills, is finishing up the paving at the new amphitheater loading dock area today.

SO this project will wrap up today. Enjoy the summer at the Dillon Amphitheater!!!


 
 

Recent Posts

See All
Tenderfoot Street paving half done

The contractor completed the north side (Highway side) of the asphalt paving today. And they completed the south side (Lake side) between highway 6 and the Anchorage East driveway. Tomorrow on Thursda

 
 
Dan Burroughs, P.E.
Town Engineer

Town of Dillon, Colorado

970.418.2544

danb@townofdillon.com

© 2021 by Town of DIllon, Colorado . Proudly created with Wix.com

bottom of page