Dan BurroughsMay 241 min readFinal Sports Field topsoil prepration underwayThe contractor is back on site and is spreading topsoil over the new sports field area getting ready for the new sod.
The contractor is back on site and is spreading topsoil over the new sports field area getting ready for the new sod.
2023 Town Park Construction Update 5/11-6/10The contractor is back on the Town Park site and is working on the remaining irrigation system beneath the future sod field. Public Works has shared the following closure information: Buffalo Street p