top of page

Installed the first inlet today

  • Dan Burroughs
  • Apr 24, 2021
  • 1 min read

Updated: Apr 27, 2021

The contractor installed the first manhole and stubbed out 40' of pipe north of the manhole to get r ready for switching the emergency access route on Monday.



 
 
 

Kommentare


Dan Burroughs, P.E.
Town Engineer

Town of Dillon, Colorado

970.418.2544

danb@townofdillon.com

© 2021 by Town of DIllon, Colorado . Proudly created with Wix.com

bottom of page