Installed the first inlet today

Dan Burroughs
Apr 24, 2021
1 min read

Updated: Apr 27, 2021

The contractor installed the first manhole and stubbed out 40' of pipe north of the manhole to get r ready for switching the emergency access route on Monday.



 
 

Recent Posts

See All
Tenderfoot Street paving half done

The contractor completed the north side (Highway side) of the asphalt paving today. And they completed the south side (Lake side) between highway 6 and the Anchorage East driveway. Tomorrow on Thursda

 
 