Amphitheater Loading Dock Progress

The Concrete has cured and COLUMBINE HILLS CONSTRUCTION was able to backfill against the new concrete wall.


The photo below is the low side of the new loading dock #2. They will be pouring concrete and installing a trench drain in the next few weeks. Dock #1 will still be at grade. Dock#2 will be able to accommodate large semi trucks more efficiently.