Lakeside curb and gutter work

Dan Burroughs
Jun 26, 2023
1 min read

The contractor poured the long and straight portions of the lakeside curb and gutter this morning.

This forms the lakeside boundary of the parking area south of the road.

This Week, they will be working on the perpendicular tie-in pieces at the end of each parking section.


 
 

Recent Posts

See All
Tenderfoot Street paving half done

The contractor completed the north side (Highway side) of the asphalt paving today. And they completed the south side (Lake side) between highway 6 and the Anchorage East driveway. Tomorrow on Thursda

 
 